Job Stories · San Antonio & Central Texas

From The Field

What we ran into, what we did about it, and what it looked like when we handed it back. Client names stay private — the work doesn't.

A Car Came Through The Wall

A car came through the wall. Four days later you couldn't tell — and the restaurant never closed a single day.

Not a bump against the block. Through it. Wall out, sheathing gone, insulation and drywall on the kitchen floor, daylight coming in from the alley.

Here's how four days looks

  • Secure — debris cleared, opening braced and boarded weather-tight before anything else
  • Demo — every fractured course of block cut back until we're on sound work
  • Masonry — new CMU laid, cores grouted, keyed into the existing wall
  • Envelope — sheathing, weather barrier and batt insulation replaced
  • Interior — steel stud framing, drywall hung, floated and painted
  • Stucco — scratch, brown and finish coat, textured to match the wall around it

Walk that alley today and there's nothing to look at. Same texture, same colour, same wall.

Four days, start to finish, with a kitchen running the whole time. That's the part that matters — every day a tenant is dark is a day somebody is losing money and somebody else is getting a phone call about it.

Vacant Suite To Lease-Ready

This suite came to us chopped up wrong for the market: a pass-through counter nobody wanted, tired paint, and no way to split the space for a second tenant.

Handled in-house, start to finish

  • Demo — old counter, 24 LF of wall, dated interior door
  • Framing — new demising wall, floor to deck, plus a new door opening
  • Drywall — hung, taped, floated and textured to match existing
  • Electrical — new disconnect and meter box so the suite runs on its own service
  • Paint — walls, ceilings, doors and frames
  • Flooring — new luxury vinyl plank and base throughout

One crew. One schedule. One number to call — no chasing five subs and hoping they show. That's what we do for property managers across San Antonio and Central Texas.

We Fixed The Floor First

Everybody wants to talk about the paint. The real work was under it.

This restaurant's slab had moved. You could see it in the settlement cracks running up the sheetrock and feel it under the carpet. Cover that up with new flooring and you're back in six months.

So we started at the bottom and worked up

  • Foundation — slab cracks routed out, filled and repaired
  • Floor prep — ground and self-levelled flat, wall to wall
  • Carpet — full tear-out, new carpet and cove base in the main dining and game room
  • Sheetrock — settlement cracks cut out, taped, floated and textured to match
  • Paint — full repaint, brand colours cut clean at every line
  • Glass — front storefront windows pulled, reset and re-sealed

Seven trades, one contract, one point of contact. The manager made one phone call and got a finished restaurant back — not a schedule to babysit.

Got One Like This?

Tell us what's going on

Emergency damage, a stubborn vacancy, or a repair that's already been "fixed" twice. We'll scope it honestly and handle all of it.